Attachment-1.pdf
Analyzed April 8, 2026
Overall Score
73%
Total Items
28
Passed
18
Failed
8
Warnings
2
Executive Summary
This estimate generally covers primary operations for the repair of the front bumper, hood, and left fender, as well as light repair of the headlamp assembly. Most standard R&I and minor refinish/prep operations are present. However, several required or commonly missed operations and materials from the Estimating Guide 2025 are missing: flexible parts additive for the bumper refinish, masking of unpainted areas on the bumper, stand setup for bumper/fender/hood, protection and storage of removed parts, corrosion protection/cavity wax for welded/sanded areas, and proper labor/material allowances for all associated items. A few labor times are slightly under the specified minima. Inclusion of additional ADAS/scan, protection, and compliance items would enhance estimate completeness.
01 - BUMPER
Core remove/replace and repair/refinish labor are present, along with some R&I trims. However, the estimate is missing required flexible additive, masking of unpainted areas, and bumpers refinish stand setup. Protection for R&I parts is missing, as are material line item entries. Labor times for several R&I operations are slightly low.
Missing Line Items
05 - HOOD
Hood repair and refinish are listed. However, missing stand setup, protection of R&I items, and masking inner edges for refinishing. Minor feather/block operations shown but missing required material entries for removed fasteners/seals/labels.
Missing Line Items
10 - FENDER
Labor and paint for fender repair is shown. Fender liner R&I labor is under guide minimum (should be 0.8, estimate uses 0.3 each for liner front/rear). No align/adjust, stand setup, or common protection/wrap/fastener replacement lines.
Missing Line Items
17 - FRONT LAMPS
LT headlamp R&I and polish/repair are addressed. No missing operations for this simple operation.
Paint/Refinish Process
Estimate includes feather prime and block, basecoat reduction, clear, and general supplies. However, cleaning of panels, prep of bumper for raw/barrier application, mask for primer operations, and hazardous waste/paint film thickness are missing.
Missing Line Items